Friday, December 18, 2009

Museum visit
















Visited the Riverside International Automotive Museum yesterday, and got to sit behind the wheel of Dick Smith's # 198 1966 427 Cobra. This car is the winningest of any Cobra and held the world record as the fastest roadster and production sports car (198.047 mph in 1967!) Saw many Maserati's, Indy cars, and lots of Dan Gurney's race cars under restoration. They have a big collection of pictures,movies and memorabilia from So. California Riverside and Ontario racetracks.http://riversideinternational.org/index.htm





Monday, December 7, 2009

Aluminium panel work







Widened out the footbox side panel to give my size 11 1/2 D shoes some more room. Positioned panels with clecos, siliconed and will be ready to permantly rivet them to the frame tomorrow.

Monday, November 30, 2009

Back to work after Thanksgiving break







Brake hydraulics complete, final secured rear wiring harness positioning, modified front suspension for reduced friction. Should be ready to install engine & transmission before Christmas.

Tuesday, November 17, 2009

Got working brakes!


Finished the brake fluid installation and testing today. Now to complete the handbrake routing and electrical harness mounting.

Sunday, October 4, 2009

Transmission mounted


Work finally resumes,after our hot summer weather has ended. Today, installed the new clutch assm. and transmission to the engine. Will be finishing the brake hydraulics and then installing the drivetrain.

Monday, September 7, 2009

Labor Day Holiday




Finished the heat shielding, final riveting & sealing of more driver side panels. Ready to mount the clutch and transmission to the engine---then I'll need assistance to place in the frame.

Monday, August 31, 2009

Engine heat shielding





Getting close to installing the engine & transmission. Installed heat shielding to reduce interior footbox temperature, from the exhaust headers.

Thursday, August 20, 2009

Tuesday, August 18, 2009

Wiring started



I installed the main harness today--easier than I thought!

Sunday, August 16, 2009

Where do I start!


Today I opened the carton, containing the complete wiring harness sections. Five other sections will tie into this primary dash harness. I think I'll start it early tomorrow am, when I've got more energy!

Tuesday, August 4, 2009

Friday, July 24, 2009

Engine work continues




After our run of hot weather, I've resumed the overhaul and installation of the fuel injection system. Have to get working early mornings, before the temp. becomes too much.

Sunday, June 28, 2009

Gas Tank Installed







Installed the gas tank, fuel pump and plumbing. Also fitted the handbrake and cables and started to reassemble the fuel intake and injection system. I quit when today's temperature hit 99---have to work early mornings,now that summer weather has arrived. A gathering of Cobra owners at the Cruise Night in Escondido last week.

Saturday, June 20, 2009

Cruising Night pictures
















Some more work done this week--driveshaft safety loop finished, front battery re-location kit, fuel injection teardown. Checked out " Summer Friday Crusin' Nights in Escondido, Ca. Many Hot Rods and a special gathering of the Pantera, Mustang and Shelby Clubs. The streets were packed with very cool cars of all makes and years. The sound these engines make bring back memories of the good old days , before smog requirements. I'm anxious to get my car finished and on the road.

Monday, June 15, 2009

More engine work




Installed high-flow water pump and a simplified belt accessory drive system. Also test fitted the driveshaft and prepared to bolt in, the safety loop, that will prevent the shaft, from tearing into the cockpit, if a drive joint breaks. Since my hip will be only one foot from this spinning joint, I thought it would give peace of mind to my passenger and myself!

Saturday, June 6, 2009

Engine just about done







The engine has now been rebuilt and re-assembled. Trial fit of the exhaust headers and only thing left is the fuel system installation.

Thursday, June 4, 2009

Engine assembly begins
















Today, finished the final machine work and beginning the engine buildup. Here's a peek inside.

Tuesday, June 2, 2009

Engine teardown







Disassembled the engine to prepare for cleaning and rebuilding. Crank will be micro-polished, new piston rings, main, rod and cam bearings will be installed along with new oil pump, water pump, new valve job , guides and timing chain set. Wow--back to almost new condition! Since I've obtained an exemption from meeting Calif. Smog requirements, I can increase the power output and rev's more than when it was new.



Friday, May 29, 2009

Finished rear brake lines










Finished the rear brake lines and now to find! and save some electronic sensors, computer and parts needed for my engine---this is the complete(Ugh) wiring harness out of the Mustang donor car that came with my powertrain. Bill , another local builder, came by today in his beautiful finished Roadster and gave me some more tips on my build. His car is a screamer---526 HP (2200 lbs!)

Thursday, May 28, 2009

Routing brake lines







Routing the brake lines takes time to layout and careful bending, as the lines are supplied in 20" and 60" straight pieces, along with a bag of assorted fittings.

Saturday, May 16, 2009

Finished installing rear drive




Got the rear axle, suspension, brakes carefully installed today by myself! Amazing what you can do with a floor jack and stands, some lumber for balance and leverage.