Sunday, December 12, 2010

A drive in the back country







Carol and I went for a great --test drive in the Santa Rosa Plateau area after fixing a water pump leak. Mid 80's and away from traffic on some two lane roads--hikers, steers, a few motorcycles and cars--a beautiful day! Jim

Sunday, November 14, 2010

Just about completed!


Had a party with relatives,neighbors and friends today to celebrate the almost completion of the car. A couple of trim items to finish.

Tuesday, November 9, 2010

Starting to look like a car


Installed the windshield and it's looking close to being done.

Sunday, November 7, 2010

Been busy











Completed the interior, finished the nose aluminum, head and taillights, and unpacked the windshield to prep for installing.

Monday, November 1, 2010

Finishing the interior







Finished the carpeting, final installation of the seats and safety harness. Next comes mounting of the lights, radiator aluminum panels, windshield and roll bars. Almost complete!

Tuesday, October 26, 2010

Back from the Batcave!


Car just returned home from J. Miller Customs, with the newly painted body mounted. Looks great! Jeff now has room for another one in the Batcave, if you're ready for final paint.

Monday, October 25, 2010

Time for body installation











Jeff Miller picked up the chassis for installation of the finished body. Doors, hood, trunk and final adjustments tomorrow.

Monday, October 18, 2010

Painting finished!




The paint job looks fantastic! Super glossy--almost looks wet. Sapphire blue metallic with a tiny touch of green tint, creamy white stripes to create the 1965 era look. Jeff Miller does great work!

Saturday, October 16, 2010

Carpet installation




Started the carpet install today. Time consuming fitting, trimming, glueing---I'll be happy when this part is over.

Thursday, October 7, 2010

Riveting panels and heat barrier insulation




Riveted most of the aluminum panels and started the installation of the heat/sound insulation and carpet, in preparation for the painted body mounting later this month. Getting close!

Friday, September 3, 2010

Today at the painters shop











Here is the Sapphire blue color the car will be, with White stripes like the cars inside. It should be ready in October.

Tuesday, August 31, 2010

Off to be painted!




Jeff Miller(Batman) was here and prepared the body gap clearances for the doors, sidepipes and windshield , then took it away to the Batcave to work his magic. Another stage closer to completion!

Sunday, August 29, 2010

First Drive!

Went for the first short drive down the street this afternoon to check out the brakes and shifting. All systems good! The sound made dogs run away, small children cry, moms and grandmothers frown, but guys gave the thumbs up! Now to send the body to the painter.

Monday, August 23, 2010

New alternator and alignment work
















Replaced the original alternator, with a newer higher amp. version-along with a mega fuse, to protect the wiring harness. Installed longer upper suspension adjusters, as the originals were running out of thread engagement. Borrowed an alignment gauge setup tool, from another FFR roadster builder, to set the front suspension caster, camber and toe-in, preparing for my first drive!

Monday, August 9, 2010

Continuing to check out electric system




Hooked up the tailights, headlights and tested the brake and turn signals for proper operation, so after the body comes back from painting, they can just be plugged into the harness and are ready to go.

Tuesday, August 3, 2010

First Startup!

It's alive! Fired up and ran on the first try. Had to sort out some misconnected gauges after showing no indicated oil pressure, but I had the wrong feed wire connected. Still sorting out a battery charging issue, but that's about it.

Thursday, July 22, 2010

Installed finished dash and sidepipes







Installed the sidepipes and mounted the completed dash. Connected the dash wiring to the chassis and engine harnesses. Pretty tight in there, but just enough room left to run some heater flex hose for those sometimes chilly winter Calif. mornings.

Friday, July 16, 2010

Sidepipes done




Picked up the hi-temp ceramic coated exhaust sidepipes and now ready to mount. Just about finished wiring up the dash and need to hook-up to the wiring harness for circuit testing. It's pushing 100 degrees this week, so I'm starting work in the garage by 7:00 am and stopping by noon.

Thursday, July 1, 2010

Exhaust sidepipe hangers done




Mounted the support hangers for the side exhaust pipes. Next thing will be to weld in the oxygen sensor bungs, then take the pipes to have them high temp ceramic powdercoated. Getting closer to first startup!

Tuesday, June 22, 2010

Dead pedal installed




Made a dead pedal stop( footrest for the LH foot next to the clutch pedal) for bracing during cornering and between shifting.

Monday, June 21, 2010

Dash finished




Gauges and switches mounted and now ready to wire into the chassis harness.

Wednesday, June 16, 2010

Rollbar mounting


Placed the rollbars and ready to drill for the mounting hardware. The body will have to be mounted and removed a couple more times, to insure proper alignment.

Saturday, June 5, 2010

Body Mounted







My Grandson Josh helped me trial mount the body this morning, so I can check for proper fitting of the exhaust and other parts.