Wednesday, April 22, 2009

Work Progressing on the Drivetrain






For the last month, I've been overhauling various parts of the drivetrain, engine, transmission, clutch, alternator, etc. This includes lots of things to be cleaned and many trips to the hardware and auto supply stores. So far, this has been the dirtiest and most time-consuming part. Next, I'll be getting into the fuel injection system.




Friday, March 20, 2009

Steering and Pedals in!




Steering and pedals are installed--getting closer to being able to trial fit the seat and controls.

Friday, March 13, 2009

Got Wheels!










The wheels arrived. Front suspension and steering are done. Carol says she's glad I have an engine and wheels so that I don't have to be like Fred Flintstone.

Tuesday, February 17, 2009

Donor Engine Delivered







5.0 Engine and transmission from an '89 Mustang arrived on Feb. 14th. Doing cleanup & preparing for eventual installation.

Saturday, January 24, 2009

What color to use when completed?







I'm trying to decide on what colors to use on completed project. Here are a few possibilities. The red one comes with "extras" that Carol won't let me order.




Saturday, January 17, 2009

The Work Continues





I waited in line on January 2nd at the DMV to obtain 1 of 500 "special construction smog exemption certificates" that are given each year in California. The DMV opened at 8AM and I received #223 at 9:20AM. Breathing a sigh of relief, I returned to the garage to continue the work which includes drilling approximately 900 holes to attach the chassis panels.

Thursday, January 8, 2009

Body Off.......






















Don helped me remove the body and now the chassis work begins.