Thursday, February 18, 2010

Been working a lot







Installed the hood hinges, fresh air blower system and hooked up the injector fuel lines to the engine. Moving quickly, now that we are having summer weather 70--80's.

Saturday, February 6, 2010

Cooling system done


Completed the cooling system--radiator,fan and ducted shroud, adjustable cooling sensor and hoses. The stainless hoses took quite a while to cut, bend and properly fit. Since these cars put out lots of heat,I wanted to carefully plan out the best way to keep the engine cool during our warm summers.

Wednesday, January 27, 2010

Heat Shields & Driveshaft installed




Hooked up driveshaft to rear end and added stainless steel heat shields to the drivers footbox, to reduce thermal penetration from the exhaust headers. Next comes the radiator cooling system.

Sunday, January 10, 2010

La Jolla Motor Car Classic
















Today, we went to the car show, celebrating the automobiles of Carroll Shelby. Many original Cobras, GT 350 Mustangs, GT40's and many other classic and unique restored cars. The event was at the La Jolla Cove Park, overlooking the Pacific ocean. Sunny, 73 degrees, a great venue for January.

Saturday, January 9, 2010

Exhaust system trial fit




Mounted exhaust headers and sidepipes to check alignment to chassis mounting. Will do some welding reinforcement modifications, before the sidepipes get their finish coating.

Thursday, January 7, 2010

It's in!




Finally got the car on it's own wheels and installed the engine & transmission! Now to finish the wiring & plumbing.

Friday, January 1, 2010

Back to working on the car








After watching the 2010 Rose Parade , I thought I'd start the new year getting a few things done on the car. Installed rear cockpit panels, battery cut-off switch and made some trunk floor access panels in case I'll ever need to access the fuel level sending unit or the fuel pump.