Tuesday, May 11, 2010

Metal mods







Using a sheet metal brake bender to fabricate an extension of the left side drivers footbox to allow more foot room and also work as a rest stop. Mocked up first in cardboard then will finish in aluminum. Checked the seat position for proper reach to the dash switches. Vroom! Vroom! Wish it was finished.

Saturday, May 8, 2010

Instrument layout




Worked on the dash today, laying out the gauges and where to put the switches. Wiring is starting to fall into place behind the dash.

Wednesday, May 5, 2010

Exhaust system




Mounted the exhaust headers and trial fitted the sidepipes before finish coating with high temp ceramic powdercoat.

Friday, April 30, 2010

Dashboard layout


Starting the dashboard layout and wiring .

Tuesday, March 9, 2010

On to the wiring




Mounted the wiper motor--just enough room next to the heater. Installed the computer and merging the engine management system with the chassis wiring harness. Lots of relays, sensors and wires to keep track of.

Thursday, February 18, 2010

Been working a lot







Installed the hood hinges, fresh air blower system and hooked up the injector fuel lines to the engine. Moving quickly, now that we are having summer weather 70--80's.

Saturday, February 6, 2010

Cooling system done


Completed the cooling system--radiator,fan and ducted shroud, adjustable cooling sensor and hoses. The stainless hoses took quite a while to cut, bend and properly fit. Since these cars put out lots of heat,I wanted to carefully plan out the best way to keep the engine cool during our warm summers.