Tuesday, August 31, 2010

Off to be painted!




Jeff Miller(Batman) was here and prepared the body gap clearances for the doors, sidepipes and windshield , then took it away to the Batcave to work his magic. Another stage closer to completion!

Sunday, August 29, 2010

First Drive!

Went for the first short drive down the street this afternoon to check out the brakes and shifting. All systems good! The sound made dogs run away, small children cry, moms and grandmothers frown, but guys gave the thumbs up! Now to send the body to the painter.

Monday, August 23, 2010

New alternator and alignment work
















Replaced the original alternator, with a newer higher amp. version-along with a mega fuse, to protect the wiring harness. Installed longer upper suspension adjusters, as the originals were running out of thread engagement. Borrowed an alignment gauge setup tool, from another FFR roadster builder, to set the front suspension caster, camber and toe-in, preparing for my first drive!

Monday, August 9, 2010

Continuing to check out electric system




Hooked up the tailights, headlights and tested the brake and turn signals for proper operation, so after the body comes back from painting, they can just be plugged into the harness and are ready to go.

Tuesday, August 3, 2010

First Startup!

It's alive! Fired up and ran on the first try. Had to sort out some misconnected gauges after showing no indicated oil pressure, but I had the wrong feed wire connected. Still sorting out a battery charging issue, but that's about it.

Thursday, July 22, 2010

Installed finished dash and sidepipes







Installed the sidepipes and mounted the completed dash. Connected the dash wiring to the chassis and engine harnesses. Pretty tight in there, but just enough room left to run some heater flex hose for those sometimes chilly winter Calif. mornings.

Friday, July 16, 2010

Sidepipes done




Picked up the hi-temp ceramic coated exhaust sidepipes and now ready to mount. Just about finished wiring up the dash and need to hook-up to the wiring harness for circuit testing. It's pushing 100 degrees this week, so I'm starting work in the garage by 7:00 am and stopping by noon.